
A set of 4 cranes ready for operation at the Baltica 2 wind farm
We are proud to announce that as part of the Baltica 2 project, our company is delivering four cranes with a lifting capacity of 5 tons and a reach of 22 meters.

All units have successfully passed the full scope of FAT (Factory Acceptance Tests) and are fully ready for operation. The equipment was manufactured on behalf of our client, PTSC M&C, and will soon be delivered to one of the largest offshore wind farms in Poland.
It is a great satisfaction for us to support the energy transition and the development of renewable energy sources in the Baltic Sea.